Assessment Year | 2024 |
---|---|
Principal Product | Agriculture Sprinklers |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 50 |
Plant Area |
135,535
ft2
|
Annual Production | 20,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $428,009 | 4,478,658 |
kWh
|
$0.096 | |
Electricity Demand | $168,663 | 39,170 |
kW-mo/yr
|
$4.31 | |
Electricity Fees | $113,652 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $17,923 | 4,915 |
Tgal
|
$3.65 | |
Water Disposal | $19,076 | 4,915 |
Tgal
|
$3.88 | |
Other Liquid (non-haz) | $6,418 | 4,915 |
gal
|
$1.31 | |
TOTAL YEARLY COSTS | $753,741 | ||||
RECOMMENDED SAVINGS* | $259,884 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $81,057 | $322,608 |
$64,522
672,101
kWh
|
$16,535
-
kW-mo/yr
|
- | - | |
02 | 2.3192: Use fossil fuel powered generator during peak demand periods | $66,500 | $73,000 | - | - | - | $66,500 | |
03 | 2.3191: Use demand controller or load shedder | $41,878 | $24,095 |
$30,097
313,506
kWh
|
$11,781
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $14,133 | $22,755 |
$12,480
130,004
kWh
|
$1,653
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $8,911 | $816 |
$8,911
92,820
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,078 | $355 |
$8,078
84,149
kWh
|
- | - | - | |
07 | 2.2623: Minimize condenser cooling water temperature | $8,021 | $5,898 |
$8,021
83,552
kWh
|
- | - | - | |
08 | 2.4112: Install soft-start to eliminate nuisance trips | $3,975 | $10,830 |
$3,975
41,403
kWh
|
- | - | - | |
09 | 2.4224: Upgrade controls on compressors | $2,456 | $4,000 |
$2,456
25,588
kWh
|
- | - | - | |
10 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,769 | $2,352 | - | - |
$4,769
-
Tgal
|
- | |
11 | 4.424: Improve space comfort conditioning | $20,106 | $3,020 |
$(-4,032.0)
(-42,000)
kWh
|
$(-362.0)
-
kW-mo/yr
|
- | $24,500 | |
TOTAL RECOMMENDED | $259,884 | $469,729 |
$134,508
1,401,123
kWh
|
$29,607
-
kW-mo/yr
|
$4,769
-
Tgal
|
$91,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs