ITAC Assessment: UF0615
ITAC logo
ITAC Assessment: UF0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Agriculture Sprinklers
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 135,535
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $428,009 4,478,658
kWh
Electricity Demand $168,663 39,170
kW-mo/yr
Electricity Fees $113,652 -
Waste Disposal Costs
Water Usage $17,923 4,915
Tgal
Water Disposal $19,076 4,915
Tgal
Other Liquid (non-haz) $6,418 4,915
gal
TOTAL YEARLY COSTS $753,741
RECOMMENDED SAVINGS* $259,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $81,057 $322,608 $64,522
672,101
kWh
$16,535
-
kW-mo/yr
- -
02 2.3192: Use fossil fuel powered generator during peak demand periods $66,500 $73,000 - - - $66,500
03 2.3191: Use demand controller or load shedder $41,878 $24,095 $30,097
313,506
kWh
$11,781
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $14,133 $22,755 $12,480
130,004
kWh
$1,653
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $8,911 $816 $8,911
92,820
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,078 $355 $8,078
84,149
kWh
- - -
07 2.2623: Minimize condenser cooling water temperature $8,021 $5,898 $8,021
83,552
kWh
- - -
08 2.4112: Install soft-start to eliminate nuisance trips $3,975 $10,830 $3,975
41,403
kWh
- - -
09 2.4224: Upgrade controls on compressors $2,456 $4,000 $2,456
25,588
kWh
- - -
10 3.4116: Meter recycled water (to reduce sewer charges) $4,769 $2,352 - - $4,769
-
Tgal
-
11 4.424: Improve space comfort conditioning $20,106 $3,020 $(-4,032.0)
(-42,000)
kWh
$(-362.0)
-
kW-mo/yr
- $24,500
TOTAL RECOMMENDED $259,884 $469,729 $134,508
1,401,123
kWh
$29,607
-
kW-mo/yr
$4,769
-
Tgal
$91,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs