| Assessment Year | 2024 |
|---|---|
| Principal Product | Corrugated Paperboard Containers |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
167,000
ft2
|
| Annual Production | 789,135
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $399,518 | 5,751,871 |
kWh
|
$0.069 | |
| Electricity Demand | $153,859 | 12,569 |
kW-mo/yr
|
$12.24 | |
| Electricity Fees | $70,721 | - |
|
- | |
| Natural Gas | $380,398 | 37,541 |
MMBtu
|
$10.13 | |
| Waste Disposal Costs | |||||
| Water Usage | $19,150 | 6,146 |
Tgal
|
$3.12 | |
| Water Disposal | $50,664 | 6,146 |
Tgal
|
$8.24 | |
| TOTAL YEARLY COSTS | $1,074,310 | ||||
| RECOMMENDED SAVINGS* | $603,026 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $185,958 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $402,389 | $1,529,500 |
$446,009
6,463,903
kWh
|
$146,892
-
kW-mo/yr
|
$(-104,512.0)
-
MMBtu
|
$(-86,000.0) | |
| 02 | 2.3191: Use demand controller or load shedder | $55,068 | $30,945 |
$39,688
575,187
kWh
|
$15,380
-
kW-mo/yr
|
- | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $45,994 | $20,000 | - | - |
$45,994
-
MMBtu
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $44,735 | $34,020 |
$27,924
404,699
kWh
|
$16,811
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,865 | $8,523 |
$9,206
133,420
kWh
|
$4,659
-
kW-mo/yr
|
- | - | |
| 06 | 2.1222: Install turbulators | $13,749 | $3,750 | - | - |
$13,749
-
MMBtu
|
- | |
| 07 | 2.4112: Install soft-start to eliminate nuisance trips | $9,443 | $21,120 |
$9,443
136,853
kWh
|
- | - | - | |
| 08 | 2.2623: Minimize condenser cooling water temperature | $7,481 | $5,900 |
$7,481
108,415
kWh
|
- | - | - | |
| 09 | 2.4224: Upgrade controls on compressors | $5,236 | $6,087 |
$5,236
75,882
kWh
|
- | - | - | |
| 10 | 3.4116: Meter recycled water (to reduce sewer charges) | $5,066 | $2,320 | - | - | - | $5,066 | |
| TOTAL RECOMMENDED | $603,026 | $1,662,165 |
$544,987
7,898,359
kWh
|
$183,742
-
kW-mo/yr
|
$(-44,769.0)
-
MMBtu
|
$(-80,934.0) | ||
| TOTAL IMPLEMENTED | $185,958 | $105,458 |
$84,299
1,221,721
kWh
|
$36,850
-
kW-mo/yr
|
$59,743
-
MMBtu
|
$5,066 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs