ITAC Assessment: UF0612
ITAC logo
ITAC Assessment: UF0612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Corrugated Paperboard Containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 167,000
ft2
Annual Production 789,135
units
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,518 5,751,871
kWh
Electricity Demand $153,859 12,569
kW-mo/yr
Electricity Fees $70,721 -
Natural Gas $380,398 37,541
MMBtu
Waste Disposal Costs
Water Usage $19,150 6,146
Tgal
Water Disposal $50,664 6,146
Tgal
TOTAL YEARLY COSTS $1,074,310
RECOMMENDED SAVINGS* $603,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $402,389 $1,529,500 $446,009
6,463,903
kWh
$146,892
-
kW-mo/yr
$(-104,512.0)
-
MMBtu
$(-86,000.0)
02 2.3191: Use demand controller or load shedder $55,068 $30,945 $39,688
575,187
kWh
$15,380
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $45,994 $20,000 - - $45,994
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $44,735 $34,020 $27,924
404,699
kWh
$16,811
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,865 $8,523 $9,206
133,420
kWh
$4,659
-
kW-mo/yr
- -
06 2.1222: Install turbulators $13,749 $3,750 - - $13,749
-
MMBtu
-
07 2.4112: Install soft-start to eliminate nuisance trips $9,443 $21,120 $9,443
136,853
kWh
- - -
08 2.2623: Minimize condenser cooling water temperature $7,481 $5,900 $7,481
108,415
kWh
- - -
09 2.4224: Upgrade controls on compressors $5,236 $6,087 $5,236
75,882
kWh
- - -
10 3.4116: Meter recycled water (to reduce sewer charges) $5,066 $2,320 - - - $5,066
TOTAL RECOMMENDED $603,026 $1,662,165 $544,987
7,898,359
kWh
$183,742
-
kW-mo/yr
$(-44,769.0)
-
MMBtu
$(-80,934.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs