ITAC Assessment: UF0610
ITAC logo
ITAC Assessment: UF0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Precision Cutting Tools
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 37,000
ft2
Annual Production 2,300,880
units
Production Hrs. Annual 6,188
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,255 3,407,653
kWh
Electricity Demand $99,108 7,701
kW-mo/yr
Electricity Fees $70,979 -
TOTAL YEARLY COSTS $483,342
RECOMMENDED SAVINGS* $256,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $108,899 $322,608 $59,482
646,542
kWh
$49,417
-
kW-mo/yr
- -
02 2.3191: Use demand controller or load shedder $28,883 $18,333 $21,945
238,536
kWh
$6,938
-
kW-mo/yr
- -
03 2.6231: Utilize controls to operate equipment only when needed $24,012 $25,400 $24,012
261,006
kWh
- - -
04 2.2622: Replace existing chiller with high efficiency model $9,119 $36,000 $5,456
59,300
kWh
$3,663
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $4,345 $2,330 $4,345
47,232
kWh
- - -
06 2.4112: Install soft-start to eliminate nuisance trips $2,691 $5,108 $2,691
29,275
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,062 $7,200 $2,062
22,409
kWh
- - -
08 2.4224: Upgrade controls on compressors $1,315 $4,000 $1,315
14,292
kWh
- - -
09 4.662: Level one – add communication using iiot devices to existing control system to modify operations $54,895 - - - - $54,895
10 4.661: Level zero – install control systems for existing equipment $15,675 $25,000 $15,675
170,383
kWh
- - -
11 4.631: Install an uninteruptable power supply $4,482 $3,330 - - $4,482 -
TOTAL RECOMMENDED $256,378 $449,309 $136,983
1,488,975
kWh
$60,018
-
kW-mo/yr
$4,482 $54,895
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs