Assessment Year | 2024 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $5 M to 10M |
# of Employees | 24 |
Plant Area |
8,000,000
ft2
|
Annual Production | 16,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,144,605 | 27,149,953 |
kWh
|
$0.079 |
Electricity Demand | $548,965 | 151,386 |
kW-mo/yr
|
$3.63 |
Electricity Fees | $139,643 | - |
|
- |
TOTAL YEARLY COSTS | $2,833,213 | |||
RECOMMENDED SAVINGS* | $547,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $333,398 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $188,564 | $146,067 |
$150,139
1,900,496
kWh
|
$38,425
-
kW-mo/yr
|
- | - | |
02 | 2.9114: Use solar heat to make electricty | $65,322 | $322,608 |
$51,398
650,603
kWh
|
$13,924
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $38,799 | $79,800 |
$33,017
417,939
kWh
|
$5,782
-
kW-mo/yr
|
- | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $35,430 | $25,350 |
$35,430
448,486
kWh
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,283 | - |
$4,293
54,340
kWh
|
- | $416 | $574 | |
06 | 4.661: Level zero – install control systems for existing equipment | $214,485 | $60,000 |
$214,485
2,714,995
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $547,883 | $633,825 |
$488,762
6,186,859
kWh
|
$58,131
-
kW-mo/yr
|
$416 | $574 | ||
TOTAL IMPLEMENTED | $333,398 | $573,825 |
$274,277
3,471,864
kWh
|
$58,131
-
kW-mo/yr
|
$416 | $574 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs