Assessment Year | 2023 |
---|---|
Principal Product | Extruded Vinyl Rubber |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
91,000
ft2
|
Annual Production | 23,601,102
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $180,107 | 2,733,320 |
kWh
|
$0.066 | |
Electricity Demand | $28,365 | 6,856 |
kW-mo/yr
|
$4.14 | |
Electricity Fees | $43,186 | - |
|
- | |
Natural Gas | $539 | 8 |
MMBtu
|
$66.54 | |
LPG | $4,538 | 167 |
MMBtu
|
$27.17 | |
Waste Disposal Costs | |||||
Water Usage | $3,584 | 979 |
Tgal
|
$3.66 | |
TOTAL YEARLY COSTS | $260,319 | ||||
RECOMMENDED SAVINGS* | $144,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $144,650 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $20,876 | $14,705 |
$18,040
273,332
kWh
|
$2,836
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $11,736 | $15,722 |
$8,283
125,502
kWh
|
$3,453
-
kW-mo/yr
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $9,612 | $25,370 |
$9,612
145,643
kWh
|
- | - | |
04 | 2.2622: Replace existing chiller with high efficiency model | $6,142 | $22,000 |
$4,764
72,176
kWh
|
$1,378
-
kW-mo/yr
|
- | |
05 | 2.4112: Install soft-start to eliminate nuisance trips | $3,959 | $11,134 |
$3,959
59,990
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,382 | $13,706 |
$2,874
43,547
kWh
|
$508
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $1,699 | $4,994 |
$1,699
25,745
kWh
|
- | - | |
08 | 4.513: Re-arrange equipment layout to reduce labor costs | $51,744 | $18,218 | - | - | $51,744 | |
09 | 4.424: Improve space comfort conditioning | $35,500 | $4,261 |
$(-4,337.0)
(-65,707)
kWh
|
$(-523.0)
-
kW-mo/yr
|
$40,360 | |
TOTAL RECOMMENDED | $144,650 | $130,110 |
$44,894
680,228
kWh
|
$7,652
-
kW-mo/yr
|
$92,104 | ||
TOTAL IMPLEMENTED | $144,650 | $130,110 |
$44,894
680,228
kWh
|
$7,652
-
kW-mo/yr
|
$92,104 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs