ITAC Assessment: UF0593
ITAC logo
ITAC Assessment: UF0593
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Surgical & Medical Instruments
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 420
Plant Area 258,000
ft2
Annual Production 55,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,221,190 17,125,093
kWh
Electricity Demand $360,943 89,823
kW-mo/yr
Electricity Fees $89,347 -
Waste Disposal Costs
Water Usage $194,235 24,892
Tgal
Water Disposal $252,376 24,404
Tgal
TOTAL YEARLY COSTS $2,118,091
RECOMMENDED SAVINGS* $656,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $630,342

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3113: Make ice during off peak hours for cooling $131,807 $215,600 $44,182
622,282
kWh
- - $87,625 -
02 2.3191: Use demand controller or load shedder $110,377 $92,132 $85,112
1,198,757
kWh
$25,265
-
kW-mo/yr
- - -
03 2.2622: Replace existing chiller with high efficiency model $97,641 $400,000 $87,713
1,235,400
kWh
$9,928
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $64,641 $136,253 $59,583
839,200
kWh
$5,058
-
kW-mo/yr
- - -
05 2.6231: Utilize controls to operate equipment only when needed $62,208 $25,500 $62,208
876,167
kWh
- - - -
06 2.3141: Use battery storage for demand control $25,827 $58,363 $(-2,485.0)
(-35,000)
kWh
$(-1,688.0)
-
kW-mo/yr
- $30,000 -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,604 - $4,452
62,708
kWh
- $588 - $564
08 4.661: Level zero – install control systems for existing equipment $121,588 $12,000 $121,588
1,712,509
kWh
- - - -
09 4.664: Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca $36,476 $11,225 $36,476
513,753
kWh
- - - -
TOTAL RECOMMENDED $656,169 $951,073 $498,829
7,025,776
kWh
$38,563
-
kW-mo/yr
$588 $117,625 $564
TOTAL IMPLEMENTED $630,342 $892,710 $501,314
7,060,776
kWh
$40,251
-
kW-mo/yr
$588 $87,625 $564
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs