Assessment Year | 2003 |
---|---|
Principal Product | Electric generators |
NAICS | 333611: Turbine and Turbine Generator Set Units Manufacturing |
SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
Sales Range | $100 M to 500M |
# of Employees | 460 |
Plant Area |
489,465
ft2
|
Annual Production | 32
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,312,466 | 46,665,240 |
kWh
|
$0.028 |
Electricity Demand | $844,396 | 141,127 |
kW-mo/yr
|
$5.98 |
Electricity Fees | $433 | - |
|
- |
Natural Gas | $201,552 | 34,232 |
MMBtu
|
$5.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $277,242 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,179 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $118,487 | $500 | - |
$118,487
-
kW-mo/yr
|
- | - | |
02 | 2.4313: Provide proper maintenance of motor driven equipment | $22,423 | $10,000 |
$13,732
522,121
kWh
|
$8,691
-
kW-mo/yr
|
- | - | |
03 | 2.4323: Use optimum size and capacity equipment | $33,114 | $24,600 |
$25,439
967,248
kWh
|
$7,675
-
kW-mo/yr
|
- | - | |
04 | 2.4323: Use optimum size and capacity equipment | $47,210 | $100,000 |
$33,911
1,289,400
kWh
|
$13,299
-
kW-mo/yr
|
- | - | |
05 | 2.2612: Use cooling tower water instead of refrigeration | $8,768 | $10,000 |
$10,847
412,440
kWh
|
$4,255
-
kW-mo/yr
|
$(-6,334.0)
-
Tgal
|
- | |
06 | 2.2612: Use cooling tower water instead of refrigeration | $46,271 | $135,400 |
$19,729
750,158
kWh
|
$31,206
-
kW-mo/yr
|
$(-4,664.0)
-
Tgal
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $556 | $680 |
$400
15,221
kWh
|
$156
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $413 | $240 |
$80
3,024
kWh
|
$31
-
kW-mo/yr
|
- | $302 | |
TOTAL RECOMMENDED | $277,242 | $281,420 |
$104,138
3,959,612
kWh
|
$183,800
-
kW-mo/yr
|
$(-10,998.0)
-
Tgal
|
$302 | ||
TOTAL IMPLEMENTED | $48,179 | $100,920 |
$34,391
1,307,645
kWh
|
$13,486
-
kW-mo/yr
|
- | $302 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs