ITAC Assessment: NC0263
ITAC logo
ITAC Assessment: NC0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Electric generators
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $100
M
to 500
M
# of Employees 460
Plant Area 489,465
ft2
Annual Production 32
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,312,466 46,665,240
kWh
Electricity Demand $844,396 141,127
kW-mo/yr
Electricity Fees $433 -
Natural Gas $201,552 34,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,179

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $118,487 $500 - $118,487
-
kW-mo/yr
- -
02 2.4313: Provide proper maintenance of motor driven equipment $22,423 $10,000 $13,732
522,121
kWh
$8,691
-
kW-mo/yr
- -
03 2.4323: Use optimum size and capacity equipment $33,114 $24,600 $25,439
967,248
kWh
$7,675
-
kW-mo/yr
- -
04 2.4323: Use optimum size and capacity equipment $47,210 $100,000 $33,911
1,289,400
kWh
$13,299
-
kW-mo/yr
- -
05 2.2612: Use cooling tower water instead of refrigeration $8,768 $10,000 $10,847
412,440
kWh
$4,255
-
kW-mo/yr
$(-6,334.0)
-
Tgal
-
06 2.2612: Use cooling tower water instead of refrigeration $46,271 $135,400 $19,729
750,158
kWh
$31,206
-
kW-mo/yr
$(-4,664.0)
-
Tgal
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $556 $680 $400
15,221
kWh
$156
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $413 $240 $80
3,024
kWh
$31
-
kW-mo/yr
- $302
TOTAL RECOMMENDED $277,242 $281,420 $104,138
3,959,612
kWh
$183,800
-
kW-mo/yr
$(-10,998.0)
-
Tgal
$302
TOTAL IMPLEMENTED $48,179 $100,920 $34,391
1,307,645
kWh
$13,486
-
kW-mo/yr
- $302
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs