ITAC Assessment: UF0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 256,000
ft2
Annual Production 36,605
ton
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $800,718 11,212,200
kWh
Electricity Demand $215,574 22,507
kW-mo/yr
Electricity Fees $162,622 -
Natural Gas $505,312 60,931
MMBtu
Waste Disposal Costs
Water Usage $52,286 11,570
Tgal
TOTAL YEARLY COSTS $1,736,512
RECOMMENDED SAVINGS* $343,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $242,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
01 2.3191: Use demand controller or load shedder $101,164 $60,322 $79,607
1,121,220
kWh
$21,557
-
kW-mo/yr
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $90,544 $67,849 $90,544
1,275,264
kWh
- - - -
03 2.4112: Install soft-start to eliminate nuisance trips $16,705 $11,574 $16,705
235,289
kWh
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $31,115 $12,420 $(-514.0)
(-7,245)
kWh
$(-403.0)
-
kW-mo/yr
- - $32,032
05 2.6231: Utilize controls to operate equipment only when needed $10,955 $25,440 $10,955
154,295
kWh
- - - -
06 2.8117: Install sub-metering equipment $10,106 $11,100 - - $10,106
-
MMBtu
- -
07 2.2135: Repair and eliminate steam leaks $3,034 $528 - - $2,877
-
MMBtu
$157
-
Tgal
-
08 4.661: Level zero – install control systems for existing equipment $79,607 $10,000 $79,607
1,121,200
kWh
- - - -
TOTAL RECOMMENDED $343,230 $199,233 $276,904
3,900,023
kWh
$21,154
-
kW-mo/yr
$12,983
-
MMBtu
$157
-
Tgal
$32,032
TOTAL IMPLEMENTED $242,066 $138,911 $197,297
2,778,803
kWh
$(-403.0)
-
kW-mo/yr
$12,983
-
MMBtu
$157
-
Tgal
$32,032
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs