Assessment Year | 2022 |
---|---|
Principal Product | Refrigeration Services |
NAICS | 488510: Freight Transportation Arrangement |
SIC | 4731: Arrangement of Transportation of Freight and Cargo |
Sales Range | $5 M to 10M |
# of Employees | 200 |
Plant Area |
240,000
ft2
|
Annual Production | 167,018
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $551,987 | 10,687,346 |
kWh
|
$0.052 |
Electricity Demand | $75,693 | 18,536 |
kW-mo/yr
|
$4.08 |
Electricity Fees | $95,203 | - |
|
- |
TOTAL YEARLY COSTS | $722,883 | |||
RECOMMENDED SAVINGS* | $477,930 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,535 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $383,709 | $1,629,000 |
$518,250
9,966,338
kWh
|
$65,460
-
kW-mo/yr
|
$(-115,001.0)
-
MMBtu
|
$(-85,000.0) | |
02 | 2.3191: Use demand controller or load shedder | $44,200 | $57,498 |
$38,902
748,114
kWh
|
$5,298
-
kW-mo/yr
|
- | - | |
03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $18,832 | $31,696 |
$18,832
362,161
kWh
|
- | - | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $11,115 | $20,214 |
$11,115
213,747
kWh
|
- | - | - | |
05 | 2.7425: Clean or color roof to reduce solar load | $8,686 | $42,931 |
$8,686
167,047
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,465 | $8,588 |
$4,465
85,867
kWh
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $3,037 | $2,270 |
$3,037
58,400
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,370 | $10,501 |
$1,792
34,456
kWh
|
$578
-
kW-mo/yr
|
- | - | |
09 | 2.4133: Use most efficient type of electric motors | $1,516 | $594 |
$1,342
25,802
kWh
|
$174
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $477,930 | $1,803,292 |
$606,421
11,661,932
kWh
|
$71,510
-
kW-mo/yr
|
$(-115,001.0)
-
MMBtu
|
$(-85,000.0) | ||
TOTAL IMPLEMENTED | $85,535 | $131,361 |
$79,485
1,528,547
kWh
|
$6,050
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs