ITAC Assessment: OK1059
ITAC logo
ITAC Assessment: OK1059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Tornado shelters
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 67,200
ft2
Annual Production 5,880
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,534 1,425,342
kWh
Electricity Fees $15,791 -
Natural Gas $21,731 4,829
MMBtu
Waste Disposal Costs
Water Usage $1,198 122
Tgal
TOTAL YEARLY COSTS $181,254
RECOMMENDED SAVINGS* $3,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,353 $8,612 $2,353
23,531
kWh
02 2.7261: Install timers and/or thermostats $361 $1,395 $361
3,611
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $471 - $471
4,713
kWh
04 2.6211: Conserve energy by efficient use of vending machines $251 $160 $251
2,510
kWh
TOTAL RECOMMENDED $3,436 $10,167 $3,436
34,365
kWh
TOTAL IMPLEMENTED $2,824 $8,612 $2,824
28,244
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs