ITAC Assessment: KU0300
ITAC logo
ITAC Assessment: KU0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PHARMACEUTICALS(ANIMAL)
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 330
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,060
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $477,774 7,376,905
kWh
Natural Gas $141,710 43,074
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $9,699 $500 $9,699
149,766
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,850 $1,780 $2,850
43,962
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,500 - $1,500
23,154
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,353 $5,000 - $5,353
-
MMBtu
-
05 3.4116: Meter recycled water (to reduce sewer charges) $1,393 $2,000 - - $1,393
TOTAL RECOMMENDED $20,795 $9,280 $14,049
216,882
kWh
$5,353
-
MMBtu
$1,393
TOTAL IMPLEMENTED $19,295 $9,280 $12,549
193,728
kWh
$5,353
-
MMBtu
$1,393
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs