ITAC Assessment: UF0569
ITAC logo
ITAC Assessment: UF0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Newspapers and Other Publications
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 65,119
ft2
Annual Production 9,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,809 3,686,880
kWh
Electricity Demand $64,929 7,429
kW-mo/yr
Electricity Fees $15,104 -
TOTAL YEARLY COSTS $470,842
RECOMMENDED SAVINGS* $104,934 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,494

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,828 $23,023 $24,828
234,225
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $18,925 $25,340 $18,925
178,538
kWh
-
03 2.4112: Install soft-start to eliminate nuisance trips $16,113 $14,830 $16,113
152,014
kWh
-
04 2.4133: Use most efficient type of electric motors $12,766 $5,229 $11,399
107,540
kWh
$1,367
-
kW-mo/yr
05 2.7212: Install or upgrade insulation on hvac distribution systems $11,660 $40,000 $11,660
110,000
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,252 $1,985 $5,618
52,998
kWh
$634
-
kW-mo/yr
07 2.2211: Use optimum temperature $3,887 - $3,887
36,667
kWh
-
08 2.2623: Minimize condenser cooling water temperature $3,742 $3,746 $3,742
35,300
kWh
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,071 $495 $3,071
28,971
kWh
-
10 2.4239: Eliminate or reduce compressed air usage $1,868 - $1,868
17,619
kWh
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,822 - $1,822
15,824
kWh
-
TOTAL RECOMMENDED $104,934 $114,648 $102,933
969,696
kWh
$2,001
-
kW-mo/yr
TOTAL IMPLEMENTED $54,494 $30,732 $52,493
493,844
kWh
$2,001
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs