ITAC Assessment: UF0557
ITAC logo
ITAC Assessment: UF0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Paper, Paperboard and Fresh-house Cartons
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 300,000
ft2
Annual Production 11,500,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,467 13,826,787
kWh
Electricity Demand $119,707 30,229
kW-mo/yr
Electricity Fees $379,396 -
Natural Gas $65,759 18,454
MMBtu
TOTAL YEARLY COSTS $912,329
RECOMMENDED SAVINGS* $141,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $133,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $34,350 $150,000 $34,350
1,374,000
kWh
-
02 2.4133: Use most efficient type of electric motors $33,993 $25,529 $25,479
1,019,157
kWh
$8,514
-
kW-mo/yr
03 2.2622: Replace existing chiller with high efficiency model $33,607 $165,000 $23,375
935,000
kWh
$10,232
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,904 $455 $8,904
356,152
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,870 $8,850 $8,870
354,801
kWh
-
06 2.4112: Install soft-start to eliminate nuisance trips $8,554 $38,357 $8,554
342,145
kWh
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,282 $25,340 $7,282
291,271
kWh
-
08 2.4222: Install adequate dryers on air lines to eliminate blowdown $3,710 $5,998 $3,710
148,387
kWh
-
09 2.4224: Upgrade controls on compressors $2,548 $2,336 $2,548
101,928
kWh
-
TOTAL RECOMMENDED $141,818 $421,865 $123,072
4,922,841
kWh
$18,746
-
kW-mo/yr
TOTAL IMPLEMENTED $133,264 $383,508 $114,518
4,580,696
kWh
$18,746
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs