Assessment Year | 2014 |
---|---|
Principal Product | Metal stampings |
NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 78 |
Plant Area |
130,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $296,138 | 3,030,767 |
kWh
|
$0.098 |
Electricity Demand | $49,590 | 6,402 |
kW-mo/yr
|
$7.75 |
Electricity Fees | $1,419 | - |
|
- |
Natural Gas | $67,875 | 5,880 |
MMBtu
|
$11.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,048 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.212: Adopt in-house material generation | $53,232 | $125,000 |
$(-82,068.0)
(-840,000)
kWh
|
$(-9,300.0)
-
kW-mo/yr
|
- | - | $(-2,400.0) | $147,000 | |
02 | 2.4224: Upgrade controls on compressors | $29,302 | $53,000 |
$26,326
269,455
kWh
|
$2,976
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $7,743 | $450 | - | - |
$7,743
-
MMBtu
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,802 | $50 |
$4,314
44,151
kWh
|
$488
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,307 | $5,081 |
$3,105
31,781
kWh
|
$355
-
kW-mo/yr
|
- | - | - | $(-153.0) | |
06 | 2.7135: Install occupancy sensors | $11,995 | $2,335 |
$11,995
122,774
kWh
|
- | - | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,667 | $100 |
$1,838
18,816
kWh
|
$209
-
kW-mo/yr
|
- | $(-300.0) | - | $(-80.0) | |
TOTAL RECOMMENDED | $112,048 | $186,016 |
$(-34,490.0)
(-353,023)
kWh
|
$(-5,272.0)
-
kW-mo/yr
|
$7,743
-
MMBtu
|
$(-300.0) | $(-2,400.0) | $146,767 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs