ITAC Assessment: UF0551
ITAC logo
ITAC Assessment: UF0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Half & Half and Creams
NAICS 311511: Fluid Milk Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 170,000
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,016,692 11,086,805
kWh
Natural Gas $502,190 156,878
MMBtu
Waste Disposal Costs
Water Usage $50,000 25,000
Tgal
Other Liquid (non-haz) $205,485 587,099
gal
TOTAL YEARLY COSTS $1,774,367
RECOMMENDED SAVINGS* $1,676,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,658,034

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.9141: Install anaerobic digester $1,032,365 $4,965,000 - $527,518
-
MMBtu
$291,200
-
gal
- - $213,647
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $537,853 $1,400,000 $782,000
8,500,000
kWh
$(-159,147.0)
-
MMBtu
- $(-85,000.0) - -
03 2.2437: Recover waste heat from equipment $62,520 $30,000 - $62,520
-
MMBtu
- - - -
04 2.1222: Install turbulators $18,151 $7,500 - $18,151
-
MMBtu
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $14,189 $1,500 $14,189
154,223
kWh
- - - - -
06 2.4133: Use most efficient type of electric motors $6,254 $4,938 $6,254
67,983
kWh
- - - - -
07 2.2136: Install / repair insulation on steam lines $2,687 $1,936 - $2,687
-
MMBtu
- - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,166 - $1,662
18,069
kWh
- - $298 $206 -
TOTAL RECOMMENDED $1,676,185 $6,410,874 $804,105
8,740,275
kWh
$451,729
-
MMBtu
$291,200
-
gal
$(-84,702.0) $206 $213,647
TOTAL IMPLEMENTED $1,658,034 $6,403,374 $804,105
8,740,275
kWh
$433,578
-
MMBtu
$291,200
-
gal
$(-84,702.0) $206 $213,647
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs