Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Recycled Water and Biosolids
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 37
Plant Area 2,090,880
ft2
Annual Production 8,860,510
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,265,986 35,968,031
kWh
Natural Gas $535,384 180,264
MMBtu
TOTAL YEARLY COSTS $2,801,370
RECOMMENDED SAVINGS* $560,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $560,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings By-product Production Savings
01 2.6231: Utilize controls to operate equipment only when needed $27,216 - $27,216
432,000
kWh
- -
02 2.4133: Use most efficient type of electric motors $23,699 $74,548 $23,699
376,179
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $16,062 $2,800 - $16,062
-
MMBtu
-
04 4.122: Develop standard procedures to improve internal yields $493,101 $1,875,550 $(-6,899.0)
(-109,500)
kWh
- $500,000
TOTAL RECOMMENDED $560,078 $1,952,898 $44,016
698,679
kWh
$16,062
-
MMBtu
$500,000
TOTAL IMPLEMENTED $560,078 $1,952,898 $44,016
698,679
kWh
$16,062
-
MMBtu
$500,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs