ITAC Assessment: UF0541
ITAC logo
ITAC Assessment: UF0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Organic Silicone Intermediates
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 871,200
ft2
Annual Production 5,300
ton
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,167,286 13,525,200
kWh
Electricity Demand $213,798 21,928
kW-mo/yr
Electricity Fees $255,342 -
Natural Gas $279,549 42,192
MMBtu
TOTAL YEARLY COSTS $1,915,975
RECOMMENDED SAVINGS* $451,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $446,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $365,719 $1,800,000 $753,360
8,760,000
kWh
$117,000
-
kW-mo/yr
$(-565,841.0)
-
MMBtu
$61,200
02 2.4133: Use most efficient type of electric motors $40,964 $16,606 $33,359
387,896
kWh
$7,605
-
kW-mo/yr
- -
03 2.6231: Utilize controls to operate equipment only when needed $22,041 $3,368 - - $22,041
-
MMBtu
-
04 2.2511: Insulate bare equipment $11,463 $2,551 - - $11,463
-
MMBtu
-
05 2.1222: Install turbulators $5,920 $7,500 - - $5,920
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,871 $1,550 - - $5,871
-
MMBtu
-
TOTAL RECOMMENDED $451,978 $1,831,575 $786,719
9,147,896
kWh
$124,605
-
kW-mo/yr
$(-520,546.0)
-
MMBtu
$61,200
TOTAL IMPLEMENTED $446,058 $1,824,075 $786,719
9,147,896
kWh
$124,605
-
kW-mo/yr
$(-526,466.0)
-
MMBtu
$61,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs