Assessment Year | 2019 |
---|---|
Principal Product | Automotive and Marine Batteries |
NAICS | 335911: Storage Battery Manufacturing |
SIC | 3691: Storage Batteries |
Sales Range | $50 M to 100M |
# of Employees | 260 |
Plant Area |
200,000
ft2
|
Annual Production | 6,240,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,332,759 | 40,964,603 |
kWh
|
$0.057 | |
Electricity Demand | $182,028 | 75,663 |
kW-mo/yr
|
$2.41 | |
Electricity Fees | $(-3,950.0) | - |
|
- | |
Natural Gas | $80,358 | 40,404 |
MMBtu
|
$1.99 | |
Waste Disposal Costs | |||||
Water Usage | $44,199 | 13,646 |
Tgal
|
$3.24 | |
Water Disposal | $85,670 | 13,646 |
Tgal
|
$6.28 | |
TOTAL YEARLY COSTS | $2,721,064 | ||||
RECOMMENDED SAVINGS* | $78,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $10,130 | $557 |
$10,130
177,724
kWh
|
- | - | - | - | |
02 | 2.2622: Replace existing chiller with high efficiency model | $5,331 | $25,000 |
$3,792
66,518
kWh
|
$1,539
-
kW-mo/yr
|
- | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,433 | $2,264 | - | - |
$3,433
-
MMBtu
|
- | - | |
04 | 2.2615: Clean condenser tubes | $4,554 | $4,248 |
$4,554
79,897
kWh
|
- | - | - | - | |
05 | 4.631: Install an uninteruptable power supply | $25,860 | $33,265 |
$(-1,140.0)
(-20,000)
kWh
|
- | - | $27,000 | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $18,000 | $18,548 | - | - | - | $18,000 | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $11,297 | $3,028 | - | - | - | - | $11,297 | |
TOTAL RECOMMENDED | $78,605 | $86,910 |
$17,336
304,139
kWh
|
$1,539
-
kW-mo/yr
|
$3,433
-
MMBtu
|
$45,000 | $11,297 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs