ITAC Assessment: UF0536
ITAC logo
ITAC Assessment: UF0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Automotive and Marine Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 200,000
ft2
Annual Production 6,240,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,332,759 40,964,603
kWh
Electricity Demand $182,028 75,663
kW-mo/yr
Electricity Fees $(-3,950.0) -
Natural Gas $80,358 40,404
MMBtu
Waste Disposal Costs
Water Usage $44,199 13,646
Tgal
Water Disposal $85,670 13,646
Tgal
TOTAL YEARLY COSTS $2,721,064
RECOMMENDED SAVINGS* $78,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4221: Install compressor air intakes in coolest locations $10,130 $557 $10,130
177,724
kWh
- - - -
02 2.2622: Replace existing chiller with high efficiency model $5,331 $25,000 $3,792
66,518
kWh
$1,539
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $3,433 $2,264 - - $3,433
-
MMBtu
- -
04 2.2615: Clean condenser tubes $4,554 $4,248 $4,554
79,897
kWh
- - - -
05 4.631: Install an uninteruptable power supply $25,860 $33,265 $(-1,140.0)
(-20,000)
kWh
- - $27,000 -
06 2.7243: Improve air circulation with destratification fans / other methods $18,000 $18,548 - - - $18,000 -
07 3.4116: Meter recycled water (to reduce sewer charges) $11,297 $3,028 - - - - $11,297
TOTAL RECOMMENDED $78,605 $86,910 $17,336
304,139
kWh
$1,539
-
kW-mo/yr
$3,433
-
MMBtu
$45,000 $11,297
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs