ITAC Assessment: UF0533
ITAC logo
ITAC Assessment: UF0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated Wastewater and Biosolids
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 435,600
ft2
Annual Production 2,659,100
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $620,725 9,891,135
kWh
TOTAL YEARLY COSTS $620,725
RECOMMENDED SAVINGS* $517,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $517,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings By-product Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,828 $109,400 $53,828
854,415
kWh
- -
02 2.4133: Use most efficient type of electric motors $42,877 $213,770 $42,877
680,587
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $20,145 $54,910 $20,145
319,766
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,617 $472 $2,617
41,532
kWh
- -
05 2.3192: Use fossil fuel powered generator during peak demand periods $1,160 $4,000 - $1,160 -
06 3.5311: Recover and reuse waste material $396,790 $810,000 - - $396,790
TOTAL RECOMMENDED $517,417 $1,192,552 $119,467
1,896,300
kWh
$1,160 $396,790
TOTAL IMPLEMENTED $517,417 $1,192,552 $119,467
1,896,300
kWh
$1,160 $396,790
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs