| Assessment Year | 2019 |
|---|---|
| Principal Product | Treated Wastewater and Biosolids |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
435,600
ft2
|
| Annual Production | 2,659,100
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $620,725 | 9,891,135 |
kWh
|
$0.063 |
| TOTAL YEARLY COSTS | $620,725 | |||
| RECOMMENDED SAVINGS* | $517,417 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $517,417 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $53,828 | $109,400 |
$53,828
854,415
kWh
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $42,877 | $213,770 |
$42,877
680,587
kWh
|
- | - | |
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $20,145 | $54,910 |
$20,145
319,766
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,617 | $472 |
$2,617
41,532
kWh
|
- | - | |
| 05 | 2.3192: Use fossil fuel powered generator during peak demand periods | $1,160 | $4,000 | - | $1,160 | - | |
| 06 | 3.5311: Recover and reuse waste material | $396,790 | $810,000 | - | - | $396,790 | |
| TOTAL RECOMMENDED | $517,417 | $1,192,552 |
$119,467
1,896,300
kWh
|
$1,160 | $396,790 | ||
| TOTAL IMPLEMENTED | $517,417 | $1,192,552 |
$119,467
1,896,300
kWh
|
$1,160 | $396,790 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs