Assessment Year | 2019 |
---|---|
Principal Product | Plastic Injection Molding and Electronic Component Assembly for Marine E |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
100,000
ft2
|
Annual Production | 234,945
units
|
Production Hrs. Annual | 6,630
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $277,642 | 4,134,928 |
kWh
|
$0.067 | |
Electricity Demand | $75,835 | 9,320 |
kW-mo/yr
|
$8.14 | |
Electricity Fees | $2,505 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $6,115 | 656 |
Tgal
|
$9.32 | |
Water Disposal | $12,525 | 626 |
Tgal
|
$20.01 | |
TOTAL YEARLY COSTS | $374,622 | ||||
RECOMMENDED SAVINGS* | $62,078 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $62,078 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.5122: Replace high resistance ducts, pipes, and fittings | $19,490 | $2,150 |
$19,490
290,891
kWh
|
- | |
02 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $18,581 | $89,000 |
$12,705
189,630
kWh
|
$5,876
-
kW-mo/yr
|
|
03 | 2.2314: Replace heat treating oven with more efficient unit | $17,787 | $43,500 |
$12,663
189,000
kWh
|
$5,124
-
kW-mo/yr
|
|
04 | 2.7135: Install occupancy sensors | $2,473 | $7,866 |
$2,473
36,915
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $2,072 | $195 |
$2,072
30,930
kWh
|
- | |
06 | 2.4224: Upgrade controls on compressors | $1,675 | $667 |
$1,675
25,005
kWh
|
- | |
TOTAL RECOMMENDED | $62,078 | $143,378 |
$51,078
762,371
kWh
|
$11,000
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $62,078 | $143,378 |
$51,078
762,371
kWh
|
$11,000
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs