ITAC Assessment: UF0531
ITAC logo
ITAC Assessment: UF0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic Injection Molding and Electronic Component Assembly for Marine E
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 100,000
ft2
Annual Production 234,945
units
Production Hrs. Annual 6,630
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,642 4,134,928
kWh
Electricity Demand $75,835 9,320
kW-mo/yr
Electricity Fees $2,505 -
Waste Disposal Costs
Water Usage $6,115 656
Tgal
Water Disposal $12,525 626
Tgal
TOTAL YEARLY COSTS $374,622
RECOMMENDED SAVINGS* $62,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.5122: Replace high resistance ducts, pipes, and fittings $19,490 $2,150 $19,490
290,891
kWh
-
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $18,581 $89,000 $12,705
189,630
kWh
$5,876
-
kW-mo/yr
03 2.2314: Replace heat treating oven with more efficient unit $17,787 $43,500 $12,663
189,000
kWh
$5,124
-
kW-mo/yr
04 2.7135: Install occupancy sensors $2,473 $7,866 $2,473
36,915
kWh
-
05 2.2511: Insulate bare equipment $2,072 $195 $2,072
30,930
kWh
-
06 2.4224: Upgrade controls on compressors $1,675 $667 $1,675
25,005
kWh
-
TOTAL RECOMMENDED $62,078 $143,378 $51,078
762,371
kWh
$11,000
-
kW-mo/yr
TOTAL IMPLEMENTED $62,078 $143,378 $51,078
762,371
kWh
$11,000
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs