Assessment Year | 2019 |
---|---|
Principal Product | Rigid Plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
498,000
ft2
|
Annual Production | 178,358,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $4,364,349 | 68,538,115 |
kWh
|
$0.064 | |
Electricity Demand | $984,019 | 120,164 |
kW-mo/yr
|
$8.19 | |
Electricity Fees | $490,809 | - |
|
- | |
Natural Gas | $350,000 | 100,000 |
MMBtu
|
$3.50 | |
Waste Disposal Costs | |||||
Water Usage | $7,493 | 3,022 |
Tgal
|
$2.48 | |
Water Disposal | $17,615 | 3,724 |
Tgal
|
$4.73 | |
TOTAL YEARLY COSTS | $6,214,285 | ||||
RECOMMENDED SAVINGS* | $727,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $96,820 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $371,464 | $1,750,000 |
$560,640
8,760,000
kWh
|
$98,268
-
kW-mo/yr
|
$(-182,324.0)
-
MMBtu
|
- | - | $(-105,120.0) | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $212,420 | $75,000 |
$158,078
2,345,375
kWh
|
$54,342
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $62,330 | $139,780 |
$50,214
784,601
kWh
|
$12,116
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $22,663 | $18,928 |
$22,663
354,117
kWh
|
- | - | - | - | - | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $19,167 | $89,865 |
$19,167
299,480
kWh
|
- | - | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,978 | $400 |
$9,978
112,109
kWh
|
- | - | - | - | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,897 | - |
$6,707
104,801
kWh
|
- | - | - | $81 | - | $109 | |
08 | 2.2522: Isolate hot or cold equipment | $4,945 | $5,090 |
$4,945
77,263
kWh
|
- | - | - | - | - | - | |
09 | 3.4113: Treat and reuse rinse waters | $17,615 | - | - | - | - |
$17,615
-
Tgal
|
- | - | - | |
TOTAL RECOMMENDED | $727,479 | $2,079,063 |
$832,392
12,837,746
kWh
|
$164,726
-
kW-mo/yr
|
$(-182,324.0)
-
MMBtu
|
$17,615
-
Tgal
|
$81 | $(-105,120.0) | $109 | ||
TOTAL IMPLEMENTED | $96,820 | $140,180 |
$66,899
1,001,511
kWh
|
$12,116
-
kW-mo/yr
|
- |
$17,615
-
Tgal
|
$81 | - | $109 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs