ITAC Assessment: UF0522
ITAC logo
ITAC Assessment: UF0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Sports Garments - T-Shirts, Polo Shirts, Hoodies, etc.
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 250,000
ft2
Annual Production 3,557,067
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,191 4,037,640
kWh
Electricity Demand $83,604 9,953
kW-mo/yr
Electricity Fees $73,873 -
Natural Gas $51,351 3,904
MMBtu
TOTAL YEARLY COSTS $478,018
RECOMMENDED SAVINGS* $244,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,982

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $36,742 $240,000 $(-3,057.0)
(-45,840)
kWh
$(-11,552.0)
-
kW-mo/yr
$51,351
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $87,600 $7,358 - - - $87,600
03 2.2437: Recover waste heat from equipment $21,070 $48,000 - - $21,070
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $10,267 - - - $10,267
-
MMBtu
-
05 2.7145: Install skylights $9,473 $48,000 $9,473
142,029
kWh
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $5,837 - $5,837
87,512
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,481 $1,413 $4,674
70,080
kWh
$806
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $4,644 $797 $4,644
69,631
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,753 $688 $2,753
41,276
kWh
- - -
10 4.112: Replace old machine with new automatic multi-station tool $60,514 $190,580 $(-1,402.0)
(-21,024)
kWh
$(-484.0)
-
kW-mo/yr
- $62,400
TOTAL RECOMMENDED $244,381 $536,836 $22,922
343,664
kWh
$(-11,229.6)
-
kW-mo/yr
$82,688
-
MMBtu
$150,000
TOTAL IMPLEMENTED $28,982 $2,898 $17,908
268,499
kWh
$806
-
kW-mo/yr
$10,267
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs