ITAC Assessment: TN0149
ITAC logo
ITAC Assessment: TN0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product UPHOLSTERED FURNITURE
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area
n/a
Annual Production 400,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,258 2,174,678
kWh
Natural Gas $62,212 16,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $230 - $230
9,086
kWh
-
02 2.2437: Recover waste heat from equipment $1,851 - - $1,851
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,508 $45,000 $5,508
97,011
kWh
-
TOTAL RECOMMENDED $7,589 $45,000 $5,738
106,097
kWh
$1,851
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs