Assessment Year | 2017 |
---|---|
Principal Product | Pipe Coating |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $10 M to 50M |
# of Employees | 108 |
Plant Area |
86,000
ft2
|
Annual Production | 357,878
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,234,870 | 13,949,679 |
kWh
|
$0.089 |
Electricity Fees | $1,234,877 | - |
|
- |
Natural Gas | $510,307 | 105,803 |
MMBtu
|
$4.82 |
TOTAL YEARLY COSTS | $2,980,054 | |||
RECOMMENDED SAVINGS* | $100,080 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $69,770 | $7,000 | - |
$69,770
-
MMBtu
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $12,043 | $1,400 | - |
$12,043
-
MMBtu
|
|
03 | 2.1116: Improve combustion control capability | $9,797 | $2,182 |
$9,797
110,698
kWh
|
- | |
04 | 2.1113: Reduce combustion air flow to optimum | $4,014 | - | - |
$4,014
-
MMBtu
|
|
05 | 2.6218: Turn off equipment when not in use | $3,268 | - |
$3,268
36,927
kWh
|
- | |
06 | 2.5112: Use continuous equipment which retains process heating conveyors within the heated chamber | $1,188 | - |
$1,188
13,428
kWh
|
- | |
TOTAL RECOMMENDED | $100,080 | $10,582 |
$14,253
161,053
kWh
|
$85,827
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs