ITAC Assessment: UF0503
ITAC logo
ITAC Assessment: UF0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Pipe Coating
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 86,000
ft2
Annual Production 357,878
units
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,234,870 13,949,679
kWh
Electricity Fees $1,234,877 -
Natural Gas $510,307 105,803
MMBtu
TOTAL YEARLY COSTS $2,980,054
RECOMMENDED SAVINGS* $100,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $69,770 $7,000 - $69,770
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $12,043 $1,400 - $12,043
-
MMBtu
03 2.1116: Improve combustion control capability $9,797 $2,182 $9,797
110,698
kWh
-
04 2.1113: Reduce combustion air flow to optimum $4,014 - - $4,014
-
MMBtu
05 2.6218: Turn off equipment when not in use $3,268 - $3,268
36,927
kWh
-
06 2.5112: Use continuous equipment which retains process heating conveyors within the heated chamber $1,188 - $1,188
13,428
kWh
-
TOTAL RECOMMENDED $100,080 $10,582 $14,253
161,053
kWh
$85,827
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs