ITAC Assessment: UF0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product medical devices
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 40,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,309 851,110
kWh
Electricity Demand $28,906 2,664
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $493 - $276
2,877
kWh
$217
-
kW-mo/yr
02 2.4225: Install common header on compressors $138 $280 $138
1,439
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $853 $482 $853
6,611
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,832 $5,165 $3,598
37,477
kWh
$2,234
-
kW-mo/yr
05 2.7135: Install occupancy sensors $1,884 $1,676 $1,884
14,603
kWh
-
06 2.7124: Make a practice of turning off lights when not needed $697 - $697
7,258
kWh
-
07 2.7496: Install partitions to reduce size of conditioned space $3,726 $1,919 $3,726
28,882
kWh
-
08 2.7425: Clean or color roof to reduce solar load $2,799 $7,128 $2,799
21,695
kWh
-
09 2.6211: Conserve energy by efficient use of vending machines $659 $686 $659
6,800
kWh
-
10 2.7229: Air condition only space necessary $227 $21 $227
1,757
kWh
-
11 2.2515: Use optimum thickness insulation $1,450 $576 $1,450
11,244
kWh
-
TOTAL RECOMMENDED $18,758 $17,933 $16,307
140,643
kWh
$2,451
-
kW-mo/yr
TOTAL IMPLEMENTED $4,813 $2,865 $4,596
39,906
kWh
$217
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs