ITAC Assessment: GT0680
ITAC logo
ITAC Assessment: GT0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Expanded Polystyrene
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 55,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,267 1,421,454
kWh
Electricity Demand $51,619 3,228
kW-mo/yr
Electricity Fees $781 -
Natural Gas $55,547 16,611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,367

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.8114: Change rate schedules or other changes in utility service $7,848 - - - - $7,848 - -
02 2.4226: Use / purchase optimum sized compressor $2,098 $3,500 $890
39,566
kWh
$1,208
-
kW-mo/yr
- - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,310 $450 - - $1,310
-
MMBtu
- - -
04 2.2511: Insulate bare equipment $1,120 $2,000 - - $1,120
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,057 $4,527 $805
33,411
kWh
$1,252
-
kW-mo/yr
- - - -
06 4.111: Add equipment/ operators to reduce production bottleneck $38,165 $11,480 $1,380
57,444
kWh
$1,860
-
kW-mo/yr
- - $(-75.0) $35,000
TOTAL RECOMMENDED $52,598 $21,957 $3,075
130,421
kWh
$4,320
-
kW-mo/yr
$2,430
-
MMBtu
$7,848 $(-75.0) $35,000
TOTAL IMPLEMENTED $3,367 $4,977 $805
33,411
kWh
$1,252
-
kW-mo/yr
$1,310
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs