ITAC Assessment: UF0434
ITAC logo
ITAC Assessment: UF0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Artificial Knee / Prosthetics
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 54,755
ft2
Annual Production 168,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $449,967 4,693,120
kWh
Electricity Demand $99,895 10,824
kW-mo/yr
Electricity Fees $64,103 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4235: Remove or close off unneeded compressed air lines $3,268 $1,893 $3,268
30,258
kWh
- - -
02 2.4221: Install compressor air intakes in coolest locations $3,786 $4,195 $3,786
35,052
kWh
- - -
03 2.4227: Use compressor air filters $1,326 $210 $1,326
10,120
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,057 $401 $1,057
8,069
kWh
- - -
05 2.4239: Eliminate or reduce compressed air usage $18,101 $4,865 $18,101
138,179
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $8,388 - $8,388
64,032
kWh
- - -
07 2.7135: Install occupancy sensors $1,414 $1,926 $1,414
13,092
kWh
- - -
08 2.7111: Reduce illumination to minimum necessary levels $1,980 $881 $1,620
14,716
kWh
$360
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,310 $20,000 $14,310
109,240
kWh
- - -
10 2.7111: Reduce illumination to minimum necessary levels $1,649 $232 $1,289
12,271
kWh
$360
-
kW-mo/yr
- -
11 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,515 $7,701 $4,515
41,808
kWh
- - -
12 2.7243: Improve air circulation with destratification fans / other methods $5,125 $2,284 $5,125
39,127
kWh
- - -
13 2.7225: Close outdoor air dampers during warm-up / cool-down periods $1,875 $10,480 $1,875
14,314
kWh
- - -
14 2.8121: Apply for tax-free status for energy purchases $11,568 - - - - $11,568
15 3.5318: Recycle fluorescent lamps $571 $3,405 - - $571
-
lb
-
TOTAL RECOMMENDED $78,933 $58,473 $66,074
530,278
kWh
$720
-
kW-mo/yr
$571
-
lb
$11,568
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs