ITAC Assessment: UF0433
ITAC logo
ITAC Assessment: UF0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Animal Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 30,000
ft2
Annual Production 64,800
ton
Production Hrs. Annual 4,940
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,187 1,589,280
kWh
Electricity Demand $6,823 5,890
kW-mo/yr
Electricity Fees $53,534 -
Natural Gas $69,292 6,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,771 $2,321 - - $1,771
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,098 $314 $1,098
9,546
kWh
- -
03 2.4133: Use most efficient type of electric motors $5,138 $8,558 $5,138
43,975
kWh
- -
04 2.2128: Use steam condensate for hot water supply (non-potable) $21,987 $10,000 - - $21,987
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,205 - $1,205
10,474
kWh
- -
06 2.4151: Develop a repair/replace policy $621 - $621
5,168
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,610 - - $11,610
-
kW-mo/yr
-
08 2.7243: Improve air circulation with destratification fans / other methods $7,722 $6,350 $7,722
67,146
kWh
- -
09 2.2441: Preheat boiler makeup water with waste process heat $23,836 $4,000 - - $23,836
-
MMBtu
10 2.4156: Establish a preventative maintenance program $1,885 $816 $1,885
25,480
kWh
- -
TOTAL RECOMMENDED $76,873 $32,359 $17,669
161,789
kWh
$11,610
-
kW-mo/yr
$47,594
-
MMBtu
TOTAL IMPLEMENTED $16,419 $1,130 $4,809
50,668
kWh
$11,610
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs