Assessment Year | 2010 |
---|---|
Principal Product | Peantut Butter, extracts |
NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
23,000
ft2
|
Annual Production | 82,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $435,145 | 6,655,006 |
kWh
|
$0.065 |
Natural Gas | $286,948 | 36,497 |
MMBtu
|
$7.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,533 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $1,250 | - |
$1,250
19,121
kWh
|
- | |
02 | 2.7145: Install skylights | $1,303 | $4,408 |
$1,303
19,918
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $13,351 | $39,918 |
$13,351
204,134
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,300 | - |
$6,300
96,334
kWh
|
- | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $5,063 | $1,050 |
$5,063
77,414
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,297 | $449 |
$1,297
19,827
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $808 | - |
$808
12,355
kWh
|
- | |
08 | 2.4224: Upgrade controls on compressors | $1,346 | - |
$1,346
20,584
kWh
|
- | |
09 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $1,815 | - | - |
$1,815
-
lb
|
|
TOTAL RECOMMENDED | $32,533 | $45,825 |
$30,718
469,687
kWh
|
$1,815
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs