ITAC Assessment: UF0422
ITAC logo
ITAC Assessment: UF0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Spunbonded Nylon Nonwoven Fabric
NAICS 313230: Nonwoven Fabric Mills
SIC 2297: Non-woven Fabrics
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 120,000
ft2
Annual Production 150,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,616,248 23,110,537
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,722 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,548

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,614 $1,161 $15,614
223,056
kWh
02 2.4239: Eliminate or reduce compressed air usage $31,555 $5,068 $31,555
450,785
kWh
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $9,291 $261 $9,291
132,725
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $139,755 $50,000 $139,755
1,996,493
kWh
05 2.7124: Make a practice of turning off lights when not needed $1,761 - $1,761
25,159
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,882 $26,728 $14,882
212,605
kWh
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $7,864 $6,675 $7,864
112,345
kWh
TOTAL RECOMMENDED $220,722 $89,893 $220,722
3,153,168
kWh
TOTAL IMPLEMENTED $41,548 $28,150 $41,548
593,545
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs