ITAC Assessment: UF0420
ITAC logo
ITAC Assessment: UF0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product camshaft
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 156,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,790 5,431,200
kWh
Electricity Demand $10,629 1,146
kW-mo/yr
Natural Gas $27,953 11,435
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8123: Pay utility bills on time $10,674 - - - - $10,674
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $5,219 $2,785 $5,219
62,883
kWh
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $30,946 $12,360 $30,946
356,580
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $38,121 $39,435 $31,378
378,050
kWh
$6,743
-
kW-mo/yr
- -
05 2.2442: Preheat combustion air with waste heat $5,022 $10,000 - - $5,022
-
MMBtu
-
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $21,915 $607 $21,915
264,034
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,325 $900 $4,325
40,424
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $3,248 - $3,248
30,359
kWh
- - -
09 2.4221: Install compressor air intakes in coolest locations $13,954 $3,000 $13,954
168,118
kWh
- - -
10 2.6212: Turn off equipment during breaks, reduce operating time $28,013 - $28,013
337,500
kWh
- - -
11 2.4133: Use most efficient type of electric motors $7,628 $33,595 $3,827
46,108
kWh
$3,801
-
kW-mo/yr
- -
12 2.7111: Reduce illumination to minimum necessary levels $10,333 $760 $8,505
102,461
kWh
$1,828
-
kW-mo/yr
- -
TOTAL RECOMMENDED $179,398 $103,442 $151,330
1,786,517
kWh
$12,372
-
kW-mo/yr
$5,022
-
MMBtu
$10,674
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs