Assessment Year | 2008 |
---|---|
Principal Product | Wheels |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3365: Aluminum Foundries |
Sales Range | $10 M to 50M |
# of Employees | 128 |
Plant Area |
62,000
ft2
|
Annual Production | 453,522
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $409,526 | 5,696,324 |
kWh
|
$0.072 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $248,815 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,456 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,814 | $810 |
$5,814
80,757
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,500 | $54,000 |
$34,500
487,000
kWh
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,206 | $16,270 |
$4,206
56,055
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $1,150 | $219 |
$1,150
18,257
kWh
|
- | - | - | |
05 | 2.7141: Lower light fixtures in high ceiling areas | $14,800 | $1,117 |
$14,800
208,927
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $13,321 | $13,321 |
$13,321
211,444
kWh
|
- | - | - | |
07 | 2.2441: Preheat boiler makeup water with waste process heat | $12,742 | $20,000 | - |
$12,742
-
MMBtu
|
- | - | |
08 | 2.4225: Install common header on compressors | $871 | $2,000 |
$871
13,802
kWh
|
- | - | - | |
09 | 2.7243: Improve air circulation with destratification fans / other methods | $151,840 | $16,695 | - | - | - | $151,840 | |
10 | 3.4116: Meter recycled water (to reduce sewer charges) | $9,571 | $1,500 | - | - |
$9,571
-
Tgal
|
- | |
TOTAL RECOMMENDED | $248,815 | $125,932 |
$74,662
1,076,242
kWh
|
$12,742
-
MMBtu
|
$9,571
-
Tgal
|
$151,840 | ||
TOTAL IMPLEMENTED | $70,456 | $71,467 |
$70,456
1,020,187
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs