Assessment Year | 2008 |
---|---|
Principal Product | Power Transformers |
NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
296,248
ft2
|
Annual Production | 40
pieces
|
Production Hrs. Annual | 8,112
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $730,222 | 9,895,120 |
kWh
|
$0.074 |
Electricity Demand | $244,992 | 56,632 |
kW-mo/yr
|
$4.33 |
Electricity Fees | $25,920 | - |
|
- |
Natural Gas | $105,340 | 7,923 |
MMBtu
|
$13.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $179,726 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,388 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $23,868 | $27,216 |
$21,722
293,558
kWh
|
$2,146
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,023 | $19,505 |
$6,023
60,840
kWh
|
- | - | - | |
03 | 2.7444: Close holes and openings in building such as broken windows | $1,665 | $459 |
$1,665
22,507
kWh
|
- | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $3,229 | $233 | - | - |
$3,229
-
MMBtu
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $2,494 | - |
$2,494
33,702
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $4,311 | $122 |
$4,311
58,260
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $136,962 | $129,516 |
$126,050
1,703,526
kWh
|
$10,912
-
kW-mo/yr
|
- | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,174 | $2,995 | - | - | - | $1,174 | |
TOTAL RECOMMENDED | $179,726 | $180,046 |
$162,265
2,172,393
kWh
|
$13,058
-
kW-mo/yr
|
$3,229
-
MMBtu
|
$1,174 | ||
TOTAL IMPLEMENTED | $7,388 | $692 |
$4,159
56,209
kWh
|
- |
$3,229
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs