ITAC Assessment: UF0410
ITAC logo
ITAC Assessment: UF0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Power Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 296,248
ft2
Annual Production 40
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $730,222 9,895,120
kWh
Electricity Demand $244,992 56,632
kW-mo/yr
Electricity Fees $25,920 -
Natural Gas $105,340 7,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $23,868 $27,216 $21,722
293,558
kWh
$2,146
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,023 $19,505 $6,023
60,840
kWh
- - -
03 2.7444: Close holes and openings in building such as broken windows $1,665 $459 $1,665
22,507
kWh
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $3,229 $233 - - $3,229
-
MMBtu
-
05 2.7111: Reduce illumination to minimum necessary levels $2,494 - $2,494
33,702
kWh
- - -
06 2.7135: Install occupancy sensors $4,311 $122 $4,311
58,260
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $136,962 $129,516 $126,050
1,703,526
kWh
$10,912
-
kW-mo/yr
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,174 $2,995 - - - $1,174
TOTAL RECOMMENDED $179,726 $180,046 $162,265
2,172,393
kWh
$13,058
-
kW-mo/yr
$3,229
-
MMBtu
$1,174
TOTAL IMPLEMENTED $7,388 $692 $4,159
56,209
kWh
- $3,229
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs