ITAC Assessment: UF0406
ITAC logo
ITAC Assessment: UF0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product bottled water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 330
Plant Area 425,000
ft2
Annual Production 1,030,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,962,005 45,302,051
kWh
Electricity Demand $348,787 177,655
kW-mo/yr
Natural Gas $142,529 130,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,057,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $272,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7141: Lower light fixtures in high ceiling areas $1,441 $253 $1,399
16,074
kWh
$42
-
kW-mo/yr
- -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $372 $289 $372
4,284
kWh
- - -
03 2.6232: Install set-back timers $6,690 $625 $6,690
76,894
kWh
- - -
04 2.5195: Change product design to reduce energy requirements $6,004 $399 $6,004
63,204
kWh
- - -
05 2.2135: Repair and eliminate steam leaks $17,857 $619 - - $17,857
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,557 $714 $17,557
184,808
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $229,959 - $229,959
2,420,621
kWh
- - -
08 2.2442: Preheat combustion air with waste heat $6,754 $22,000 - - $6,754
-
MMBtu
-
09 2.2515: Use optimum thickness insulation $7,084 $1,380 - - $7,084
-
MMBtu
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,733 $6,479 $18,733
197,608
kWh
- - -
11 4.631: Install an uninteruptable power supply $4,744,561 $5,831 - - - $4,744,561
TOTAL RECOMMENDED $5,057,012 $38,589 $280,714
2,963,493
kWh
$42
-
kW-mo/yr
$31,695
-
MMBtu
$4,744,561
TOTAL IMPLEMENTED $272,457 $2,713 $247,516
2,605,429
kWh
- $24,941
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs