Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product coolers
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 29
Plant Area 40,800
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,528 652,080
kWh
Electricity Demand $27,235 4,120
kW-mo/yr
Natural Gas $141,362 12,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.2515: Use optimum thickness insulation $45,739 $1,287 - - $45,739
-
MMBtu
-
02 2.2515: Use optimum thickness insulation $10,863 $369 - - $10,863
-
MMBtu
-
03 2.4322: Use or replace with energy efficient substitutes $22,502 $4,417 - - $22,502
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,757 $5,610 $2,996
49,920
kWh
$761
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $603 $230 $603
10,051
kWh
- - -
06 2.4133: Use most efficient type of electric motors $2,133 $15,174 $1,181
20,187
kWh
$952
-
kW-mo/yr
- -
07 2.1321: Replace fossil fuel equipment with electrical equipment $5,571 $15,174 - - $5,571
-
MMBtu
-
08 2.6231: Utilize controls to operate equipment only when needed $28,000 $270 - - - $28,000
TOTAL RECOMMENDED $119,168 $42,531 $4,780
80,158
kWh
$1,713
-
kW-mo/yr
$84,675
-
MMBtu
$28,000
TOTAL IMPLEMENTED $92,909 $32,504 $1,784
30,238
kWh
$952
-
kW-mo/yr
$62,173
-
MMBtu
$28,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs