| Assessment Year | 2007 |
|---|---|
| Principal Product | coolers |
| NAICS | 326140: Polystyrene Foam Product Manufacturing |
| SIC | 3086: Plastics Foam Products |
| Sales Range | $1 M to 5M |
| # of Employees | 29 |
| Plant Area |
40,800
ft2
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $38,528 | 652,080 |
kWh
|
$0.059 |
| Electricity Demand | $27,235 | 4,120 |
kW-mo/yr
|
$6.61 |
| Natural Gas | $141,362 | 12,154 |
MMBtu
|
$11.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $119,168 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $92,909 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2515: Use optimum thickness insulation | $45,739 | $1,287 | - | - |
$45,739
-
MMBtu
|
- | |
| 02 | 2.2515: Use optimum thickness insulation | $10,863 | $369 | - | - |
$10,863
-
MMBtu
|
- | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $22,502 | $4,417 | - | - |
$22,502
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,757 | $5,610 |
$2,996
49,920
kWh
|
$761
-
kW-mo/yr
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $603 | $230 |
$603
10,051
kWh
|
- | - | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $2,133 | $15,174 |
$1,181
20,187
kWh
|
$952
-
kW-mo/yr
|
- | - | |
| 07 | 2.1321: Replace fossil fuel equipment with electrical equipment | $5,571 | $15,174 | - | - |
$5,571
-
MMBtu
|
- | |
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $28,000 | $270 | - | - | - | $28,000 | |
| TOTAL RECOMMENDED | $119,168 | $42,531 |
$4,780
80,158
kWh
|
$1,713
-
kW-mo/yr
|
$84,675
-
MMBtu
|
$28,000 | ||
| TOTAL IMPLEMENTED | $92,909 | $32,504 |
$1,784
30,238
kWh
|
$952
-
kW-mo/yr
|
$62,173
-
MMBtu
|
$28,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs