Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 140,000
ft2
Annual Production 40,000
Tgal
Production Hrs. Annual 7,956
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $938,245 12,867,277
kWh
Electricity Demand $196,400 46,447
kW-mo/yr
Natural Gas $357,502 44,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $306,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $48,081 $134,669 $44,401
608,227
kWh
$3,680
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $940 - $793
10,857
kWh
$147
-
kW-mo/yr
-
03 2.7141: Lower light fixtures in high ceiling areas $477 $150 $436
5,975
kWh
$41
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $806 $118 $806
11,046
kWh
- -
05 2.2113: Repair or replace steam traps $4,676 $218 - - $4,676
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,060 $1,600 $3,060
41,913
kWh
- -
07 2.2515: Use optimum thickness insulation $32,078 $6,105 $32,078
400,979
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $547 - $547
5,363
kWh
- -
09 2.4133: Use most efficient type of electric motors $6,769 $19,429 $6,185
84,848
kWh
$584
-
kW-mo/yr
-
10 2.3212: Optimize plant power factor $209,563 $17,000 $192,051
2,584,624
kWh
$17,512
-
kW-mo/yr
-
TOTAL RECOMMENDED $306,997 $179,289 $280,357
3,753,832
kWh
$21,964
-
kW-mo/yr
$4,676
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs