| Assessment Year | 2002 |
|---|---|
| Principal Product | mica, clay, and sand |
| NAICS |
n/a
|
| SIC | 3299: Nonmetallic Mineral Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 87 |
| Plant Area |
75,000
ft2
|
| Annual Production | 150,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $547,068 | 20,394,246 |
kWh
|
$0.027 |
| Electricity Demand | $420,027 | 44,103 |
kW-mo/yr
|
$9.52 |
| Electricity Fees | $18,470 | - |
|
- |
| Natural Gas | $868,906 | 117,815 |
MMBtu
|
$7.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $143,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $130,673 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1114: Limit and control secondary combustion air in furnace | $51,728 | $50,000 | - | - |
$51,728
-
MMBtu
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $55,158 | $15,000 | - | - |
$55,158
-
MMBtu
|
- | |
| 03 | 2.6125: Keep equipment clean | $21,155 | $1,000 | - | - |
$21,155
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $5,620 | $1,577 | - | - |
$5,620
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $6,444 | $6,536 | - | - |
$6,444
-
MMBtu
|
- | |
| 06 | 2.4151: Develop a repair/replace policy | $2,372 | $2,996 |
$1,584
58,433
kWh
|
$788
-
kW-mo/yr
|
- | - | |
| 07 | 2.2515: Use optimum thickness insulation | $298 | $860 | - | - |
$298
-
MMBtu
|
- | |
| 08 | 2.7134: Use photocell controls | $260 | $300 |
$81
3,066
kWh
|
$79
-
kW-mo/yr
|
- | $100 | |
| TOTAL RECOMMENDED | $143,035 | $78,269 |
$1,665
61,499
kWh
|
$867
-
kW-mo/yr
|
$140,403
-
MMBtu
|
$100 | ||
| TOTAL IMPLEMENTED | $130,673 | $69,296 |
$1,665
61,499
kWh
|
$867
-
kW-mo/yr
|
$128,041
-
MMBtu
|
$100 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs