ITAC Assessment: NC0229
ITAC logo
ITAC Assessment: NC0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product mica, clay, and sand
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 75,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $547,068 20,394,246
kWh
Electricity Demand $420,027 44,103
kW-mo/yr
Electricity Fees $18,470 -
Natural Gas $868,906 117,815
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $130,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1114: Limit and control secondary combustion air in furnace $51,728 $50,000 - - $51,728
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $55,158 $15,000 - - $55,158
-
MMBtu
-
03 2.6125: Keep equipment clean $21,155 $1,000 - - $21,155
-
MMBtu
-
04 2.2511: Insulate bare equipment $5,620 $1,577 - - $5,620
-
MMBtu
-
05 2.2511: Insulate bare equipment $6,444 $6,536 - - $6,444
-
MMBtu
-
06 2.4151: Develop a repair/replace policy $2,372 $2,996 $1,584
58,433
kWh
$788
-
kW-mo/yr
- -
07 2.2515: Use optimum thickness insulation $298 $860 - - $298
-
MMBtu
-
08 2.7134: Use photocell controls $260 $300 $81
3,066
kWh
$79
-
kW-mo/yr
- $100
TOTAL RECOMMENDED $143,035 $78,269 $1,665
61,499
kWh
$867
-
kW-mo/yr
$140,403
-
MMBtu
$100
TOTAL IMPLEMENTED $130,673 $69,296 $1,665
61,499
kWh
$867
-
kW-mo/yr
$128,041
-
MMBtu
$100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs