ITAC Assessment: SF0068
ITAC logo
ITAC Assessment: SF0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Case Goods & Seeting
NAICS
n/a
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 153,694
ft2
Annual Production 9,600
units
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,713 2,197,538
kWh
Natural Gas $13,389 2,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,248 $20,160 $5,248
44,842
kWh
- -
02 2.7135: Install occupancy sensors $2,174 $3,300 $2,174
18,464
kWh
- -
03 2.7144: Install spectral reflectors / delamp $12,233 $1,000 $12,233
104,338
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,062 $2,666 $1,062
9,086
kWh
- -
05 2.4314: Use synthetic lubricant $847 $2,867 $847
7,327
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,141 $1,587 $3,141
26,671
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,680 $62,972 $35,680
304,220
kWh
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,266 $7,015 $7,054
60,082
kWh
$(-1,788.0)
-
MMBtu
-
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,731 $6,605 $7,823
66,823
kWh
$(-2,092.0)
-
MMBtu
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,393 $700 $1,393
12,016
kWh
- -
11 3.5313: Increase amount of waste recovered for resale $6,972 $9,060 - - $6,972
12 3.5314: Use in-process recycling whenever possible $3,888 $14,750 - - $3,888
TOTAL RECOMMENDED $83,635 $132,682 $76,655
653,869
kWh
$(-3,880.0)
-
MMBtu
$10,860
TOTAL IMPLEMENTED $83,635 $132,682 $76,655
653,869
kWh
$(-3,880.0)
-
MMBtu
$10,860
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs