Assessment Year | 1995 |
---|---|
Principal Product | Case Goods & Seeting |
NAICS |
n/a
|
SIC | 2599: Furniture and Fixtures, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 165 |
Plant Area |
153,694
ft2
|
Annual Production | 9,600
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $257,713 | 2,197,538 |
kWh
|
$0.12 |
Natural Gas | $13,389 | 2,083 |
MMBtu
|
$6.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,635 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,635 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,248 | $20,160 |
$5,248
44,842
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $2,174 | $3,300 |
$2,174
18,464
kWh
|
- | - | |
03 | 2.7144: Install spectral reflectors / delamp | $12,233 | $1,000 |
$12,233
104,338
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,062 | $2,666 |
$1,062
9,086
kWh
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $847 | $2,867 |
$847
7,327
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,141 | $1,587 |
$3,141
26,671
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,680 | $62,972 |
$35,680
304,220
kWh
|
- | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,266 | $7,015 |
$7,054
60,082
kWh
|
$(-1,788.0)
-
MMBtu
|
- | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,731 | $6,605 |
$7,823
66,823
kWh
|
$(-2,092.0)
-
MMBtu
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,393 | $700 |
$1,393
12,016
kWh
|
- | - | |
11 | 3.5313: Increase amount of waste recovered for resale | $6,972 | $9,060 | - | - | $6,972 | |
12 | 3.5314: Use in-process recycling whenever possible | $3,888 | $14,750 | - | - | $3,888 | |
TOTAL RECOMMENDED | $83,635 | $132,682 |
$76,655
653,869
kWh
|
$(-3,880.0)
-
MMBtu
|
$10,860 | ||
TOTAL IMPLEMENTED | $83,635 | $132,682 |
$76,655
653,869
kWh
|
$(-3,880.0)
-
MMBtu
|
$10,860 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs