ITAC Assessment: SD0464
ITAC logo
ITAC Assessment: SD0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Stamped Metal Products
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 182
Plant Area 527,031
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,321
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,429 1,911,368
kWh
Electricity Demand $94,544 6,108
kW-mo/yr
Electricity Fees $21,612 -
Natural Gas $12,113 1,786
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,895 $27,250 $7,409
84,581
kWh
$2,486
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,189 $1,500 $5,749
65,628
kWh
$1,440
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,453 $11,325 $4,362
49,797
kWh
$1,091
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,360 $6,450 $3,812
43,516
kWh
$1,548
-
kW-mo/yr
05 2.7134: Use photocell controls $4,384 $5,920 $3,754
42,859
kWh
$630
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,852 $200 $3,852
43,971
kWh
-
07 2.7135: Install occupancy sensors $3,360 $3,887 $3,360
38,353
kWh
-
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,686 $400 $1,262
14,412
kWh
$424
-
kW-mo/yr
09 2.7224: Reduce space conditioning during non-working hours $1,556 $500 $1,556
29,052
kWh
-
TOTAL RECOMMENDED $42,735 $57,432 $35,116
412,169
kWh
$7,619
-
kW-mo/yr
TOTAL IMPLEMENTED $9,895 $27,250 $7,409
84,581
kWh
$2,486
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs