Assessment Year | 2006 |
---|---|
Principal Product | Construction Equipment |
NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
400,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 5,374
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $893,690 | 13,806,383 |
kWh
|
$0.065 |
Electricity Demand | $146,562 | 31,420 |
kW-mo/yr
|
$4.66 |
Natural Gas | $442,831 | 39,869 |
MMBtu
|
$11.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $560,276 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,999 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $1,756 | $1,706 | - | - |
$1,756
-
MMBtu
|
- | - | - | |
02 | 2.3212: Optimize plant power factor | $145,983 | $20,000 |
$121,398
2,243,951
kWh
|
$24,585
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,287 | $810 |
$8,287
128,079
kWh
|
- | - | - | - | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $12,147 | $33,136 |
$9,648
178,337
kWh
|
$2,499
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,956 | - |
$4,723
72,995
kWh
|
- | - | $855 | $1,378 | - | |
06 | 2.4133: Use most efficient type of electric motors | $6,473 | $24,457 |
$6,455
92,188
kWh
|
$18
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7292: Lower ceiling to reduce conditioned space | $12,995 | $1,250 |
$12,995
200,843
kWh
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,450 | $2,219 |
$1,936
37,657
kWh
|
$514
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.7313: Recycle air for heating, ventilation and air conditioning | $22,183 | $24,800 |
$22,183
342,857
kWh
|
- | - | - | - | - | |
10 | 4.651: Install back-up equipment | $341,046 | $100,000 | - |
$841
-
kW-mo/yr
|
- | - | - | $340,205 | |
TOTAL RECOMMENDED | $560,276 | $208,378 |
$187,625
3,296,907
kWh
|
$28,457
-
kW-mo/yr
|
$1,756
-
MMBtu
|
$855 | $1,378 | $340,205 | ||
TOTAL IMPLEMENTED | $16,999 | $2,516 |
$13,010
201,074
kWh
|
- |
$1,756
-
MMBtu
|