ITAC Assessment: UF0390
ITAC logo
ITAC Assessment: UF0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Wind turbines
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range n/a
# of Employees 106
Plant Area 394,397
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 7,072
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $468,104 11,571,813
kWh
Electricity Demand $200,718 19,831
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $495,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $148,376 $619,757 $144,915
2,605,949
kWh
$3,461
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,981 $8,763 $5,885
74,262
kWh
$96
-
kW-mo/yr
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $87,992 $39,000 $87,992
1,517,100
kWh
- -
04 2.7229: Air condition only space necessary $41,661 $1,080 $41,661
718,295
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,722 - $5,722
97,387
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,951 $31,040 $11,951
206,045
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,826 $513 $29,826
514,245
kWh
- -
08 2.7134: Use photocell controls $909 $306 $862
8,438
kWh
$47
-
kW-mo/yr
-
09 2.7226: Use computer programs to optimize hvac performance $27,903 $20,000 $27,193
472,634
kWh
$710
-
kW-mo/yr
-
10 2.7135: Install occupancy sensors $437 $347 $437
10,670
kWh
- -
11 2.7111: Reduce illumination to minimum necessary levels $10,152 $36,122 $10,152
247,598
kWh
- -
12 2.7111: Reduce illumination to minimum necessary levels $4,655 $1,610 $4,655
80,256
kWh
- -
13 3.6193: Install equipment (eg compactor) to reduce disposal costs $979 $4,996 - - $979
14 3.6193: Install equipment (eg compactor) to reduce disposal costs $118,800 $8,400 - - $118,800
TOTAL RECOMMENDED $495,344 $771,934 $371,251
6,552,879
kWh
$4,314
-
kW-mo/yr
$119,779
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs