ITAC Assessment: UF0383
ITAC logo
ITAC Assessment: UF0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Newspapers
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 400
Plant Area 20,000
ft2
Annual Production 4,680,000
pieces
Production Hrs. Annual 7,462
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,120 5,361,000
kWh
Electricity Demand $100,483 11,778
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7134: Use photocell controls $952 $954 $407
9,697
kWh
$545
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $3,247 $456 $3,247
47,745
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,179 $126 $9,179
134,979
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,149 $1,296 $337
8,015
kWh
$93
-
kW-mo/yr
$1,719
05 2.2522: Isolate hot or cold equipment $602 $85 $602
8,857
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,891 $2,960 $7,096
168,959
kWh
$5,795
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $2,618 - $2,618
38,500
kWh
- -
08 2.8123: Pay utility bills on time $235 - - - $235
TOTAL RECOMMENDED $31,873 $5,877 $23,486
416,752
kWh
$6,433
-
kW-mo/yr
$1,954
TOTAL IMPLEMENTED $11,563 $1,422 $9,516
142,994
kWh
$93
-
kW-mo/yr
$1,954
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs