ITAC Assessment: UF0380
ITAC logo
ITAC Assessment: UF0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Nylon
NAICS 325220: Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824: Manmade Organic Fibers, Except Cellulosic
Sales Range n/a
# of Employees 1,700
Plant Area 1,742,400
ft2
Annual Production 490,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,210,174 49,686,500
kWh
Electricity Demand $458,877 154,848
kW-mo/yr
Natural Gas $229,412 22,941
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $437,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $433,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,443 $1,104 $277
10,162
kWh
$41
-
kW-mo/yr
$1,125
02 2.7124: Make a practice of turning off lights when not needed $886 - $623
22,834
kWh
$263
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $961 $353 $804
29,467
kWh
$157
-
kW-mo/yr
-
04 2.6231: Utilize controls to operate equipment only when needed $388,094 $48,067 $327,265
11,987,724
kWh
$60,829
-
kW-mo/yr
-
05 2.7131: Add area lighting switches $1,085 $4,305 $1,085
39,735
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $44,780 $2,688 $44,780
1,226,829
kWh
- -
07 3.1181: Eliminate a by-product $703 $160 $703
19,256
kWh
- -
TOTAL RECOMMENDED $437,952 $56,677 $375,537
13,336,007
kWh
$61,290
-
kW-mo/yr
$1,125
TOTAL IMPLEMENTED $433,577 $50,915 $372,748
13,233,809
kWh
$60,829
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs