Assessment Year | 1994 |
---|---|
Principal Product | Dyed Wool Fabrics |
NAICS |
n/a
|
SIC | 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing) |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
160,000
ft2
|
Annual Production | 18,000
thousand feet
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $652,506 | 7,854,045 |
kWh
|
$0.083 |
LPG | $79,374 | 15,273 |
MMBtu
|
$5.20 |
Fuel Oil #2 | $3,690 | 840 |
MMBtu
|
$4.39 |
Fuel Oil #6 | $266,615 | 120,958 |
MMBtu
|
$2.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $100,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $1,318 | $2,800 | - | - |
$1,318
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $4,574 | $9,200 |
$4,574
-
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,730 | $200 |
$1,730
20,809
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,717 | $4,300 |
$6,118
73,564
kWh
|
$(-1,165.0)
-
MMBtu
|
$(-236.0)
-
MMBtu
|
|
05 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $54,000 | $110,000 |
$249,000
3,000,879
kWh
|
$(-195,000.0)
-
MMBtu
|
- | |
06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $16,980 | $18,000 | - | - |
$16,980
-
MMBtu
|
|
07 | 2.4322: Use or replace with energy efficient substitutes | $16,767 | $9,000 |
$16,767
201,641
kWh
|
- | - | |
TOTAL RECOMMENDED | $100,086 | $153,500 |
$278,189
3,296,893
kWh
|
$(-196,165.0)
-
MMBtu
|
$18,062
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs