| Assessment Year | 2006 |
|---|---|
| Principal Product | Corrugated Plastic Tubing |
| NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 35 |
| Plant Area |
11,300
ft2
|
| Annual Production | 10,500,000
lb
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $188,577 | 2,871,980 |
kWh
|
$0.066 |
| Electricity Demand | $25,155 | 7,413 |
kW-mo/yr
|
$3.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $661,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,493 | $334 |
$2,493
31,555
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $493 | $415 |
$480
4,118
kWh
|
$13
-
kW-mo/yr
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $5,064 | - |
$5,064
64,098
kWh
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $341 | - |
$341
4,320
kWh
|
- | - | - | |
| 05 | 2.7124: Make a practice of turning off lights when not needed | $542 | $750 |
$542
7,744
kWh
|
- | - | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $14,507 | $13,121 |
$13,490
192,718
kWh
|
$1,017
-
kW-mo/yr
|
- | - | |
| 07 | 2.2628: Utilize a less expensive cooling method | $3,877 | $21,000 |
$2,307
32,947
kWh
|
$130
-
kW-mo/yr
|
$1,440 | - | |
| 08 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $626,232 | $1,134,871 |
$613,200
8,760,000
kWh
|
$13,032
-
kW-mo/yr
|
- | - | |
| 09 | 3.7221: Improve process control to prevent spills of material | $4,718 | $463 |
$602
7,623
kWh
|
- | $4,116 | - | |
| 10 | 3.5316: Contract a wood pallet recycling company | $3,000 | - | - | - | - | $3,000 | |
| TOTAL RECOMMENDED | $661,267 | $1,170,954 |
$638,519
9,105,123
kWh
|
$14,192
-
kW-mo/yr
|
$5,556 | $3,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs