ITAC Assessment: UF0369
ITAC logo
ITAC Assessment: UF0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Malt beverages
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 45,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 3,129
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,328 1,649,760
kWh
Electricity Demand $38,808 420
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7124: Make a practice of turning off lights when not needed $1,002 $2,082 $1,002
15,189
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,073 $460 $2,073
34,551
kWh
03 2.2511: Insulate bare equipment $21,928 $477 $21,928
365,459
kWh
04 2.7313: Recycle air for heating, ventilation and air conditioning - $24,800 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,520 - $1,520
8,004
kWh
06 2.7251: Reduce air conditioning load by evaporating water from roof $2,471 $900 $2,471
37,435
kWh
07 2.2621: Modify refrigeration system to operate at a lower pressure $5,189 $5,000 $5,189
68,627
kWh
08 4.125: - - -
TOTAL RECOMMENDED $34,183 $33,719 $34,183
529,265
kWh
TOTAL IMPLEMENTED $25,003 $27,819 $25,003
415,199
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs