ITAC Assessment: UF0359
ITAC logo
ITAC Assessment: UF0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Scrap Metal
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 873,000
ft2
Annual Production 100
ton
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,746 249,453
kWh
Coal $102,331 55,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,239 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings Personnel Changes Savings
01 2.6231: Utilize controls to operate equipment only when needed $10,279 - $10,279
90,168
kWh
- -
02 2.4133: Use most efficient type of electric motors $839 - $839
7,357
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $627 - $627
5,504
kWh
- -
04 2.7134: Use photocell controls $448 - $448
3,931
kWh
- -
05 4.632: Change operating conditions $15,046 - - $46
-
MMBtu
$15,000
TOTAL RECOMMENDED $27,239 - $12,193
106,960
kWh
$46
-
MMBtu
$15,000
TOTAL IMPLEMENTED $16,122 - $1,076
9,435
kWh
$46
-
MMBtu
$15,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs