ITAC Assessment: UM0212
ITAC logo
ITAC Assessment: UM0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aggregate
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $50
M
to 100
M
# of Employees 44
Plant Area 840,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 7,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,082 2,816,240
kWh
Electricity Demand $150,782 8,268
kW-mo/yr
Electricity Fees $4,459 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $59,075 $182,900 $17,291
613,600
kWh
$41,784
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,000 $10,035 $6,000
182,713
kWh
- -
03 2.7233: Use properly designed and sized hvac equipment $4,407 $500 $4,407
156,950
kWh
- -
04 2.2511: Insulate bare equipment $2,000 $1,000 $1,448
44,000
kWh
$552
-
kW-mo/yr
-
05 2.4131: Size electric motors for peak operating efficiency $1,885 $2,786 $956
32,310
kWh
$929
-
kW-mo/yr
-
06 2.3212: Optimize plant power factor $1,270 $3,417 - - $1,270
TOTAL RECOMMENDED $74,637 $200,638 $30,102
1,029,573
kWh
$43,265
-
kW-mo/yr
$1,270
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs