| Assessment Year | 2004 |
|---|---|
| Principal Product | Wallboards |
| NAICS | 327420: Gypsum Product Manufacturing |
| SIC | 3275: Gypsum Products |
| Sales Range | $10 M to 50M |
| # of Employees | 98 |
| Plant Area |
1,742,400
ft2
|
| Annual Production | 600,000
thousand feet
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $868,579 | 15,504,857 |
kWh
|
$0.056 |
| Electricity Demand | $224,757 | 27,125 |
kW-mo/yr
|
$8.29 |
| Natural Gas | $898,735 | 166,786 |
MMBtu
|
$5.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $342,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1213: Direct warmest air to combustion intake | $309,508 | $180,000 | - | - | - |
$309,508
-
MMBtu
|
- | - | |
| 02 | 2.4151: Develop a repair/replace policy | $1,095 | $68,454 |
$1,095
16,589
kWh
|
- | - | - | - | - | |
| 03 | 2.7131: Add area lighting switches | $9,552 | $13,873 |
$5,404
95,506
kWh
|
$4,148
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $11,459 | - |
$9,911
176,983
kWh
|
- | - | - | $593 | $955 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,725 | $385 |
$7,745
138,299
kWh
|
- | - | - | $(-20.0) | - | |
| 06 | 2.3212: Optimize plant power factor | $3,477 | $12,000 | - | - | $3,477 | - | - | - | |
| TOTAL RECOMMENDED | $342,816 | $274,712 |
$24,155
427,377
kWh
|
$4,148
-
kW-mo/yr
|
$3,477 |
$309,508
-
MMBtu
|
$573 | $955 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs