ITAC Assessment: UF0336
ITAC logo
ITAC Assessment: UF0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Flyers & Magazines
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 60,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,724 3,489,560
kWh
Electricity Demand $23,054 6,687
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7145: Install skylights $19,224 $20,117 $19,504
309,582
kWh
- $(-280.0)
02 2.7492: Use proper thickness of insulation on building envelope $16,196 $39,000 $16,196
257,084
kWh
- -
03 2.7243: Improve air circulation with destratification fans / other methods $6,074 $25,200 $6,074
96,406
kWh
- -
04 2.7261: Install timers and/or thermostats $8,379 $2,000 $8,379
133,000
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,739 $2,513 $7,072
153,738
kWh
$667
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,944 $70 $3,944
62,603
kWh
- -
07 2.7111: Reduce illumination to minimum necessary levels $1,079 $1,400 $866
18,834
kWh
$213
-
kW-mo/yr
-
TOTAL RECOMMENDED $62,635 $90,300 $62,035
1,031,247
kWh
$880
-
kW-mo/yr
$(-280.0)
TOTAL IMPLEMENTED $23,271 $31,113 $22,391
401,978
kWh
$880
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs